Colorado
Waste Water Treatment Facility
2021-Present
muGrid Analytics is performing design, operations planning, and economic battery storage for a waste water treatment facility at a city in Colorado. The system commissioned in October 2023, and muGrid Analytics provides optimized economic dispatch control and operations. muGrid is co-optimizing revenue streams of a demand response program from the municipal utility along with behind-the-meter peak shaving. This project is conducted in partnership with Iconergy.